- 2011-08-27
- Laivasähkötyö got the electrical work done with the sulphur washing system,
which was delivered by Wärtsilä Diesel, onboard Containership VII during the
docking at Turku Repair Yard in Naantali.
With the installed washer, the vessel will meet the future sulphur dioxide
emission (SOX) requirements in the SECA area.
Juha Pavén
Project Engineer
- E-mail:
- juha.paven(a)lst.fi
- Telephone:
- +358 400 525 537
- Fax:
- +358 (0)2 5100 340
Military - Electric
(Laivasähkötyö Oy)










